Efficient Civil Engineering with PE-HD Shaft Systems for Pump Stations: A Comparison

Choosing the right shaft system for pump stations can mean the difference between a quick, efficient project and lengthy, costly construction processes. Our DORANT and HEKANT pump stations offer significant advantages over traditional construction methods with their factory-prefabricated PE-HD shaft systems.

Installation Steps for the Kordes System - Efficient and Safe:
1. Leveling Layer of Sand
2. Setting the Shaft in Place
3. Filling / Compacting

Advantages:
- No additional material required
- Minimal time investment (a few hours)
- High safety due to 100% factory prefabrication

Installation Steps for Traditional Construction - Time-Consuming and Error-Prone:
1. Laying the Foundation On-Site
2. Setting the Shaft in Place
3. On-Site Buoyancy Control
4. Filling / Compacting. Creating a Load-Bearing Layer On-Site
5. Sealing Ring / Reinforced Concrete Cover
6. Filling / Compacting

Disadvantages:
- High material requirements
- Significant time investment (several days)
- Increased risk of errors

Our system not only saves time and materials but also minimizes the risk of errors. Factory prefabrication ensures the highest quality and reliability. Choose the most modern solution in civil engineering and benefit from the advantages of our PE-HD shaft systems.

See also  Municipal SBR Systems