Fast and Efficient: Installing Our PE-HD Pump Stations

The demands on modern wastewater technology are constantly growing. Efficient and reliable solutions for planning and implementation are becoming increasingly important. Our DORANT and HEKANT pump stations set new standards with the innovative PE-HD shaft system, which is manufactured in combination with reinforced concrete. Thanks to their lightweight construction, even large shaft systems can be pre-assembled at the factory. This saves valuable time and allows for hassle-free on-site installation. In fact, the installation and backfilling of the pump stations can be completed within a few hours.
Thanks to the lightweight design, even large shaft systems can be pre-assembled in the factory. This saves valuable time and enables problem-free installation on site. In fact, the relocation and backfilling of the pumping stations can be completed within a few hours.

 

The advantages of our PE-HD shaft systems are numerous:

• Cost savings on construction sites with groundwater management: Our systems significantly reduce effort and costs.

- Efficiency in wastewater diversion during the construction period: our solutions minimise the need to remove or pump wastewater.
    cost-efficient design.

The result is clear: Our pump stations offer the simplest and fastest way to install a high-performance pump station.
    install.
Decision-makers and planners in engineering offices and wastewater companies benefit from our advanced and field-proven solutions.

See also  Wastewater treatment plants in Kenya