Fast and Efficient: Installing Our PE-HD Pumping Stations

The demands on modern wastewater technology are constantly increasing. Efficient and reliable solutions for planning and implementation are more important than ever. Our DORANT and HEKANT pumping stations set new standards with their innovative PE-HD shaft system, which is manufactured in combination with reinforced concrete.

Thanks to the lightweight construction, even large shaft systems can be pre-assembled at the factory. This saves valuable time and enables a smooth installation on-site. In fact, the installation and backfilling of the pumping stations can be completed within a few hours.

The advantages of our PE-HD shaft systems are numerous:

  • Cost savings on construction sites with groundwater management: Our systems significantly reduce effort and costs.

  • Efficiency in wastewater rerouting during construction: Our solutions make wastewater diversion or pumping cost-effective.

The result is clear: With our pumping stations, we offer the simplest and fastest way to install a high-performance pumping station.
Decision-makers and planners in engineering firms and wastewater operations benefit from our advanced and field-tested solutions.

See also  Automotive - Benshausen