Untitled 1

05733 9908-0

Pump station GARANT

Kordes.de    >    Products    >    GARANT

Features

Kordes Pumpstation Nassaufstellung Abwasser Garant Beont Schacht 696x1024 - Pumpstation GARANT

Robust

Concrete shaft systems have proven their worth for wastewater pump stations for decades. The precast concrete parts according to DIN 4034 Part 1 are delivered quality-controlled in consistently high quality. Our structures are designed for high loads and are ideally suited for permanent use.

Buoyancy protection

A buoyancy control, depending on the requirements, is prefabricated as a part of the base shaft. In addition to the cantilever plate, the high dead weight also has a major effect in ensuring good buoyancy safety.

Connections

Pipeline connections are made in the factory according to planning. We are able to install openings for various feed-through systems.

Armatures

Kordes armatures score points for their particularly break-proof materials and low-maintenance design with few assembly and fastening elements. All components are perfectly matched to each other.

Ready to Install

The armatures are pre-assembled at the factory, so that time-consuming assembly at the construction site can be saved.

Application

Wastewater pump stations for municipal and industrial use

Kordes Pumpstation Nassaufstellung Abwasser Garant Beton Einsatz 1024x576 - Pumpstation GARANT

Wastewater pump stations in wet installation are ideally suited for municipal and industrial wastewater, as well as surface water.

Particular loads on the pump stations in the communal area are caused by heavy rain, digester gases, fats and fibrous materials. In the case of industrial waste water, there are aggressive chemical loads due to the ingredients. In addition to heavy rain events, areas of application for surface runoff from parking lots and streets also have the problem of increased salinity.

In each individual case, the pumping station must be dimensioned and configured in such a way that sufficient resistance for permanent use can be guaranteed. Due to the location, static safety against uplift in the presence of groundwater is often required for the shaft structure. Our ready-to-assemble pump stations minimize construction time. This significantly reduces costs for groundwater management and wastewater discharge, as well as traffic congestion during the construction phase.

Planning

Customized and individually designed

A frequently requested service from our company is planning support. The focus here is on the planning of wastewater pump stations, including the calculation of pumps, calculation of pressure pipelines up to the planning of pressure pipe flushing stations. The planning of EMSR and control technology are also among our strengths.

Kordes Pumpstation Nassaufstellung Abwasser Garant Beton Planung Zeichnung 3D 724x1024 - Pumpstation GARANT
Kordes Pumpstation Abwasser Dorant Hekant Garant Planung Konstruktion 1024x683 - Pumpstation GARANT

When you place your order, you will receive a detailed 2D and 3D drawing from us for your building project. This serves to visualize your new pumping station and facilitates technical optimization before the start of construction. Only when everything is perfect do we start production.

Kordes Pumpstation Nassaufstellung Abwasser Garant Beton Planung Zeichnung 2D 1024x725 - Pumpstation GARANT

Shaft systems

KSK 10

Kordes Pumpstation Nassaufstellung Abwasser Garant Beton Schacht Zeichnung KSK 10 1024x999 - Pumpstation GARANT

KSK 15

Kordes Pumpstation Nassaufstellung Abwasser Garant Beton Schacht Zeichnung KSK 15 1024x999 - Pumpstation GARANT

KSK 20

Kordes Pumpstation Nassaufstellung Abwasser Garant Beton Schacht Zeichnung KSK 20 1024x999 - Pumpstation GARANT

KSK 25

Kordes Pumpstation Nassaufstellung Abwasser Garant Beton Schacht Zeichnung KSK 25 1024x999 - Pumpstation GARANT

Armatures

Kordes Pumpstation Nassaufstellung Abwasser Dorant Garant Armatur Guss - Pumpstation GARANT

100% nodular iron,
powder coated
DN 80 – 200

Kordes Pumpstation Nassaufstellung Abwasser Dorant Garant Armatur Edelstahl Guss - Pumpstation GARANT

Nodular iron,
powder coated 
and stainless steel
DN 80 – 200

Kordes Pumpstation Nassaufstellung Abwasser Dorant Garant Armatur Edelstahl - Pumpstation GARANT

100% stainless steel
DN 80 – 100

Stainless steel armatures: corrosion resistant and durable

Kordes Pumpstation Abwasser Dorant Garant Armatur Edelstahl VA 1024x502 - Pumpstation GARANT
Kordes Pumpstation Abwasser Dorant Schacht Armatur Edelstahl Ausruestung 683x1024 - Pumpstation GARANT
Kordes Pumpstation Abwasser Dorant Schacht Armatur Edelstahl Einstieg - Pumpstation GARANT

Pumps

For optimum flow rate and flow velocity, armatures, pressure lines and pumps must be precisely matched to the requirements of your construction site. Our product range extends from pumps with cutting impeller system for small wastewater volumes with admixtures, to pumps with free-flow impeller system. Both variants are available with and without explosion protection. For certain types of wastewater, pumps with special resistance to corrosive substances are also required.

Do not leave the right selection of your pump to chance and let us support you in the correct design. So that we can offer you the pump that is best suited for your construction site, we work together with the leading manufacturers of wastewater pumps. Our valve system can be combined with almost all common pumps with DIN flange.

Kordes Pumpstation Nassaufstellung Abwasser Dorant Garant Pumpe Amarex F max Freistromrad 939x1024 - Pumpstation GARANT

Control units

With our Kordes control systems, we are able to switch single, double or multiple plants. Our control systems are used by commercial and municipal plant operators and can be customized with electronic components on request. In the field of municipal wastewater discharge, we also supply PLC-controlled systems as well as process visualization and telecontrol technology. We will also be pleased to supply you with the appropriate control unit for your project. In the factory, the control system and the desired components are already installed and tested in the control unit according to your specifications.

WDN control unit

Kordes Pumpstation Abwasser Dorant Hekant Garant Steuerung Schaltschrank 1 - Pumpstation GARANT
Kordes Pumpstation Abwasser Dorant Hekant Garant Steuerung Schaltschrank 2 1024x576 - Pumpstation GARANT

CEN / CDN control unit

Kordes Pumpstation Abwasser Dorant Hekant Garant Steuerung CEN CDN - Pumpstation GARANT

Control unit CEB / CDB

Kordes Pumpstation Abwasser Dorant Hekant Garant Variant Steuerung CEB CDB 1 - Pumpstation GARANT

Accessories

Access ladder

Pump stations require a safe access ladder. For this purpose, we build stainless steel ladders with safety steps in widths of 300mm and 400mm. The pull-out boarding aid provides safety when entering. For deeper pumps stations we offer a fall protection system or an intermediate ceiling according to UVV.

Kordes Pumpstation Abwasser Dorant Hekant Garant Zubehoer Leiter 1024x703 - Pumpstation GARANT

Pipe lead-through

For a tight connection between the shaft and the pipe, we offer Kordes ConFix feed-through systems. They form a permanently elastic, tight connection between the pipe and the concrete or PE-HD wall. Pipes made of cast iron, steel and plastic are sealed gas- and watertight in core drill holes or lining pipes by pressing together an NBR rubber ring by means of two V2A stainless steel flanges.

Kordes Pumpstation Abwasser Dorant Hekant Garant Zubehoer Durchfuehrung Confix 1024x703 - Pumpstation GARANT

Plug-in gate valve and spindle gate valve

In the case of pumping stations, it is sometimes desirable to be able to shut off the supply lines for work in the shaft. For this we offer plug-in or spindle gate valves for the appropriate pipe diameter. It is operated mechanically or by an electric drive. The controller can be connected to the BMS.

Kordes Pumpstation Abwasser Dorant Hekant Garant Zubehoer Absperrschieber 1024x703 - Pumpstation GARANT

Shaft ventilation

Appropriate stainless steel or PE-HD piping should be installed in the shaft for ventilation. For the end of the underground pipeline we offer ventilation chimneys made of stainless steel in DN 100 / DN 150. The stainless steel cover can be equipped with vapor hood on request.

Kordes Pumpstation Abwasser Dorant Hekant Garant Zubehoer Belueftung Entlueftung 1024x703 - Pumpstation GARANT

Covers

We offer shaft covers depending on your requirements in square or round shape as BEGU, in cast iron or stainless steel. The shaft system corresponds to the load class SLW 60, so that shaft covers from class A to D can be freely selected.

Kordes Pumpstation Abwasser Dorant Hekant Garant Zubehoer Schacht Abdeckung 1024x703 - Pumpstation GARANT

Armature shaft

Armatures are usually located in the pump station but some operators prefer the armatures in a separate shaft, which we offer as a prefabricated part in PE-HD or reinforced concrete. The inductive volume measuring device or ventilation valves are also often installed in separate shafts.

Kordes Pumpstation Abwasser Dorant Hekant Garant Zubehoer Armaturenschacht 1024x703 - Pumpstation GARANT

Technical building

Optionally we offer a suitable technical building for your pump station. We arrange the equipment individually with you in order to find an ideal solution for later operational management.

Kordes Pumpstation Abwasser Dorant Hekant Garant Zubehoer Wartungshaus 1024x703 - Pumpstation GARANT