Untitled 1

05733 9908-0

Pump station DORANT

Kordes.de    >    Products    >    DORANT

Features

Kordes Pumpstation Nassaufstellung Abwasser Dorant PE HD Wickelrohr Schacht 797x1024 - Pumpstation DORANT

Resistant

The plastic PE-HD is corrosion-resistant to gases and reliably resistant to chemical components in wastewater. The smooth inner surface prevents deposits.

Easy discharge

The fully equipped pumping station is delivered to the construction site in one piece and lifted directly from the truck into the excavation pit.

Buoyancy protection

Depending on the requirements, buoyancy protection is already firmly welded to the structure by the manufacturer - in the form of an enlarged cantilever plate made of PE-HD with a steel-reinforced concrete core. 

Armatures

Kordes armatures score with particularly unbreakable materials and a low-maintenance design with few assembly and fastening elements.

Lightweight

The lightweight Dorant variants are particularly easy to transport and can therefore be used in difficult-to-access terrain.

Demanding areas of application

The Dorant pump station is also suitable for water protection areas, as the tank is of double-walled design and can be equipped with permanent leakage monitoring on request.

Application

Wastewater pump stations for municipal and industrial use

Kordes Pumpstation Nassaufstellung Abwasser Dorant PE HD Wickelrohr Einsatz 1024x576 - Pumpstation DORANT

Wastewater pump stations in wet installation are ideally suited for municipal and industrial wastewater, as well as surface water.

Particular loads on the pump stations in the communal area are caused by heavy rain, digester gases, fats and fibrous materials. In the case of industrial waste water, there are aggressive chemical loads due to the ingredients. In addition to heavy rain events, areas of application for surface runoff from parking lots and streets also have the problem of increased salinity.

In each individual case, the pumping station must be dimensioned and configured in such a way that sufficient resistance for permanent use can be guaranteed. Due to the location, static safety against uplift in the presence of groundwater is often required for the shaft structure. Our ready-to-assemble pump stations minimize construction time. This significantly reduces costs for groundwater management and wastewater discharge, as well as traffic congestion during the construction phase.

Planning

Customized and individually designed

A frequently requested service from our company is planning support. The focus here is on the planning of wastewater pump stations, including the calculation of pumps, calculation of pressure pipelines up to the planning of pressure pipe flushing stations. The planning of EMSR and control technology are also among our strengths.

Kordes Pumpstation Nassaufstellung Abwasser Dorant PE HD Wickelrohr Planung Zeichnung 3D 724x1024 - Pumpstation DORANT
Kordes Pumpstation Abwasser Dorant Hekant Garant Planung Konstruktion 1024x683 - Pumpstation DORANT

When you place your order, you will receive a detailed 2D and 3D drawing from us for your building project. This serves to visualize your new pumping station and facilitates technical optimization before the start of construction. Only when everything is perfect do we start production.

Kordes Pumpstation Nassaufstellung Abwasser Dorant PE HD Wickelrohr Planung Zeichnung 2D 1024x725 - Pumpstation DORANT

Shaft systems

Variable from A to Z

Kordes Pumpstation Nassaufstellung Abwasser Dorant PE HD Wickelrohr Schacht Schnitt 695x1024 - Pumpstation DORANT

PE-HD

What is so special about PE-HD?

Kordes Pumpstation Abwasser Dorant Hekant PE HD Wickelrohr Schacht Material 1024x359 - Pumpstation DORANT

High density polyethylene (PE-HD) is a versatile plastic. This material is one of the most widely used in the field of industrial and municipal wastewater.

Thanks to its organic composition of only carbon and hydrogen, through which no toxic ingredients can diffuse out, PE stands for sustainability and an excellent environmental balance.

The anti-adhesive inner surface (k<0.05mm) prevents deposits on the shaft wall<0,05mm)

Kordes Pumpstation Abwasser Dorant Hekant PE HD Wickelrohr Schacht Schachtwand Schnitt 683x1024 - Pumpstation DORANT

Installation

The pump station is placed in one piece within a few hours

Kordes Pumpstation Abwasser Dorant Hekant PE HD Wickelrohr Schacht Einbau 1 Lieferung Lkw - Pumpstation DORANT
Kordes Pumpstation Abwasser Dorant Hekant PE HD Wickelrohr Schacht Einbau 2 Kran Aufrichten - Pumpstation DORANT
Kordes Pumpstation Abwasser Dorant Hekant PE HD Wickelrohr Schacht Einbau 3 Kran 768x1024 - Pumpstation DORANT
Kordes Pumpstation Abwasser Dorant Hekant PE HD Wickelrohr Schacht Einbau 4 Kran Versetzen 768x1024 - Pumpstation DORANT
Kordes Pumpstation Abwasser Dorant Hekant PE HD Wickelrohr Schacht Einbau 5 Kran Versetzen 768x1024 - Pumpstation DORANT

Safe against buoyancy and ready for operation more quickly, even with high groundwater levels

Kordes Pumpstation Abwasser Dorant Hekant PE HD Wickelrohr Schacht Einbau 6 Baugrube Grundwasser - Pumpstation DORANT
Kordes Pumpstation Abwasser Dorant Hekant PE HD Wickelrohr Schacht Auftriebssicherung 1 - Pumpstation DORANT

Armatures

Kordes Pumpstation Nassaufstellung Abwasser Dorant Garant Armatur Guss - Pumpstation DORANT

100% nodular iron,
powder coated
DN 80 – 200

Kordes Pumpstation Nassaufstellung Abwasser Dorant Garant Armatur Edelstahl Guss - Pumpstation DORANT

Nodular iron,
powder coated 
and stainless steel
DN 80 – 200

Kordes Pumpstation Nassaufstellung Abwasser Dorant Garant Armatur Edelstahl - Pumpstation DORANT

100% stainless steel
DN 80 – 100

Stainless steel armatures: corrosion resistant and durable

Kordes Pumpstation Abwasser Dorant Garant Armatur Edelstahl VA 1024x502 - Pumpstation DORANT
Kordes Pumpstation Abwasser Dorant Schacht Armatur Edelstahl Ausruestung 683x1024 - Pumpstation DORANT
Kordes Pumpstation Abwasser Dorant Schacht Armatur Edelstahl Einstieg - Pumpstation DORANT

Comparison

Kordes Pumpstation Abwasser Dorant PE HD Wickelrohr Schacht Vergleich 1024x710 - Pumpstation DORANT
Dorant Hekant Vergleich xyFirma - Pumpstation DORANT

The delivery takes place as a kit that must be completed at the construction site

Kordes all Pumpstation Druckentwaesserung Klaeranlage Keinklaeranlage Abwasser Logo freigestellt - Pumpstation DORANT

The pump station is delivered in one piece, including technical installations

Dorant Hekant Vergleich xyFirma - Pumpstation DORANT

Installation errors possible

Kordes all Pumpstation Druckentwaesserung Klaeranlage Keinklaeranlage Abwasser Logo freigestellt - Pumpstation DORANT

Installation errors excluded

Dorant Hekant Vergleich xyFirma - Pumpstation DORANT

Installation time 2 days and more

Kordes all Pumpstation Druckentwaesserung Klaeranlage Keinklaeranlage Abwasser Logo freigestellt - Pumpstation DORANT

Installation time within 2 hours

Dorant Hekant Vergleich xyFirma - Pumpstation DORANT

The concrete cover is placed on the shaft pipe by means of a sealing ring

Kordes all Pumpstation Druckentwaesserung Klaeranlage Keinklaeranlage Abwasser Logo freigestellt - Pumpstation DORANT

Cover plate made of PE-HD with steel-tested concrete core firmly welded to the casing pipe

Dorant Hekant Vergleich xyFirma - Pumpstation DORANT

Exposed concrete susceptible to corrosion if no covering is made at the construction site

Kordes all Pumpstation Druckentwaesserung Klaeranlage Keinklaeranlage Abwasser Logo freigestellt - Pumpstation DORANT

Bottom side and dome entrance completely lined with HD-PE

Dorant Hekant Vergleich xyFirma - Pumpstation DORANT

Assembly and age-related leaks are to be expected

Kordes all Pumpstation Druckentwaesserung Klaeranlage Keinklaeranlage Abwasser Logo freigestellt - Pumpstation DORANT

The cover plate is firmly and tightly welded to the shaft casing pipe

Dorant Hekant Vergleich xyFirma - Pumpstation DORANT

On-site concreting of a load transfer ring is necessary according to requirements

Kordes all Pumpstation Druckentwaesserung Klaeranlage Keinklaeranlage Abwasser Logo freigestellt - Pumpstation DORANT

The load is transferred from the cover plate directly to the shaft casing pipe

Dorant Hekant Vergleich xyFirma - Pumpstation DORANT

Base plate in PE-HD

Kordes all Pumpstation Druckentwaesserung Klaeranlage Keinklaeranlage Abwasser Logo freigestellt - Pumpstation DORANT

PE-HD base plate with steel-reinforced concrete core

Dorant Hekant Vergleich xyFirma - Pumpstation DORANT

Groundwater-induced bulging causes stresses and vibrations in the armatures

Kordes all Pumpstation Druckentwaesserung Klaeranlage Keinklaeranlage Abwasser Logo freigestellt - Pumpstation DORANT

Stresses and vibrations are excluded from the concrete and PE-HD due to the special Kordes connection system

Dorant Hekant Vergleich xyFirma - Pumpstation DORANT

A foundation plate must be concreted on site, on which the PE-HD shaft is placed.

If buoyancy protection is required, this must be separately provided using a concrete bed

Kordes all Pumpstation Druckentwaesserung Klaeranlage Keinklaeranlage Abwasser Logo freigestellt - Pumpstation DORANT

According to the requirements, the buoyancy protection is already welded at the factory as a cantilevered base plate

Pumps

For optimum flow rate and flow velocity, armatures, pressure lines and pumps must be precisely matched to the requirements of your construction site. Our product range extends from pumps with cutting impeller system for small wastewater volumes with admixtures, to pumps with free-flow impeller system. Both variants are available with and without explosion protection. For certain types of wastewater, pumps with special resistance to corrosive substances are also required.

Do not leave the right selection of your pump to chance and let us support you in the correct design. So that we can offer you the pump that is best suited for your construction site, we work together with the leading manufacturers of wastewater pumps. Our valve system can be combined with almost all common pumps with DIN flange.

Kordes Pumpstation Nassaufstellung Abwasser Dorant Garant Pumpe Amarex F max Freistromrad 939x1024 - Pumpstation DORANT

Control units

With our Kordes control systems, we are able to switch single, double or multiple plants. Our control systems are used by commercial and municipal plant operators and can be customized with electronic components on request. In the field of municipal wastewater discharge, we also supply PLC-controlled systems as well as process visualization and telecontrol technology. We will also be pleased to supply you with the appropriate control unit for your project. In the factory, the control system and the desired components are already installed and tested in the control unit according to your specifications.

WDN control unit

Kordes Pumpstation Abwasser Dorant Hekant Garant Steuerung Schaltschrank 1 - Pumpstation DORANT
Kordes Pumpstation Abwasser Dorant Hekant Garant Steuerung Schaltschrank 2 1024x576 - Pumpstation DORANT

CEN / CDN control unit

Kordes Pumpstation Abwasser Dorant Hekant Garant Steuerung CEN CDN - Pumpstation DORANT

Control unit CEB / CDB

Kordes Pumpstation Abwasser Dorant Hekant Garant Variant Steuerung CEB CDB 1 - Pumpstation DORANT

Accessories

Access ladder

Pump stations require a safe access ladder. For this purpose, we build stainless steel ladders with safety steps in widths of 300mm and 400mm. The pull-out boarding aid provides safety when entering. For deeper pumps stations we offer a fall protection system or an intermediate ceiling according to UVV.

Kordes Pumpstation Abwasser Dorant Hekant Garant Zubehoer Leiter 1024x703 - Pumpstation DORANT

Pipe lead-through

For a tight connection between the shaft and the pipe, we offer Kordes ConFix feed-through systems. They form a permanently elastic, tight connection between the pipe and the concrete or PE-HD wall. Pipes made of cast iron, steel and plastic are sealed gas- and watertight in core drill holes or lining pipes by pressing together an NBR rubber ring by means of two V2A stainless steel flanges.

Kordes Pumpstation Abwasser Dorant Hekant Garant Zubehoer Durchfuehrung Confix 1024x703 - Pumpstation DORANT

Plug-in gate valve and spindle gate valve

In the case of pumping stations, it is sometimes desirable to be able to shut off the supply lines for work in the shaft. For this we offer plug-in or spindle gate valves for the appropriate pipe diameter. It is operated mechanically or by an electric drive. The controller can be connected to the BMS.

Kordes Pumpstation Abwasser Dorant Hekant Garant Zubehoer Absperrschieber 1024x703 - Pumpstation DORANT

Shaft ventilation

Appropriate stainless steel or PE-HD piping should be installed in the shaft for ventilation. For the end of the underground pipeline we offer ventilation chimneys made of stainless steel in DN 100 / DN 150. The stainless steel cover can be equipped with vapor hood on request.

Kordes Pumpstation Abwasser Dorant Hekant Garant Zubehoer Belueftung Entlueftung 1024x703 - Pumpstation DORANT

Covers

We offer shaft covers depending on your requirements in square or round shape as BEGU, in cast iron or stainless steel. The shaft system corresponds to the load class SLW 60, so that shaft covers from class A to D can be freely selected.

Kordes Pumpstation Abwasser Dorant Hekant Garant Zubehoer Schacht Abdeckung 1024x703 - Pumpstation DORANT

Armature shaft

Armatures are usually located in the pump station but some operators prefer the armatures in a separate shaft, which we offer as a prefabricated part in PE-HD or reinforced concrete. The inductive volume measuring device or ventilation valves are also often installed in separate shafts.

Kordes Pumpstation Abwasser Dorant Hekant Garant Zubehoer Armaturenschacht 1024x703 - Pumpstation DORANT

Technical building

Optionally we offer a suitable technical building for your pump station. We arrange the equipment individually with you in order to find an ideal solution for later operational management.

Kordes Pumpstation Abwasser Dorant Hekant Garant Zubehoer Wartungshaus 1024x703 - Pumpstation DORANT