Efficient Civil Engineering with PE-HD Shaft Systems for Pumping Stations: A Comparison

The choice of the right shaft system for pumping stations can make the difference between a fast, efficient project and a long, costly construction process. Our DORANT and HEKANT pumping stations offer decisive advantages over traditional construction methods with their factory-preassembled PE-HD shaft systems.

Installation Steps with the Kordes System – Efficient and Safe:

  1. Sand leveling layer
  2. Placing the shaft
  3. Backfilling / Compaction

Advantages:

  • No additional material costs
  • Short installation time (a few hours)
  • High safety due to 100% factory pre-assembly

Installation Steps with Traditional Construction – Time-Consuming and Error-Prone:

  1. Pouring base plate on-site
  2. Placing the shaft
  3. On-site buoyancy protection
  4. Backfilling / Compaction, creating load balancing on-site
  5. Sealing ring / reinforced concrete cover
  6. Backfilling / Compaction

Disadvantages:

  • High material costs
  • Long installation time (several days)
  • Increased risk of errors

Our system not only saves time and material but also minimizes the risk of errors. The factory pre-assembly guarantees the highest quality and reliability. Choose the most advanced solution in civil engineering and benefit from the advantages of our PE-HD shaft systems.